Build out data form

Please supply us with your first occupation dates and build out rates for your site. To enable us to assess the impact of your development on our network and should upgrades be required we will design the most appropriate solution to accommodate the development within 24 months of planning being granted. The completion of this form will assist us with this process and the information will also be utilised to determine whether part of the development can connect before reinforcement is deemed necessary.

 

Please note: If it has been determined that your site has sufficient capacity then we do not require the completion of this form. If you have any queries on this please email us at: [email protected].

General site / foul drainage

Proposed connecting SWS manhole reference number / location

Surface Water (connections only permitted once SUDS hierarchy complete)

Please upload your Build Out Profile
Please see example Build Out Profile.

  1. Reuse Consider

    Rain harvesting reduces demand on water supply and quality of runoff discharged from site.

  2. Infiltration consider

    Infiltration potential, even if infiltration rates are low to reduce the volume of runoff from sites.

  3. Watercourse consider

    High flow conditions. 

    Requirements for consent to discharge.

  4. Storm sewer consider

    Existing capacity of the sewer.

    Potential for surcharge conditions within the sewer at time at time of discharge.

  5. Combined sewer consider

    Discharge to the combined sewer should not increase the risk of combined sewer overflow (CSO) spill.